Exact equipment and cooling architecture
Confirm the proposed model, external dimensions, service clearances and whether the system is electric, nitrogen-based or another documented architecture before preparing the room.
SANAI HEALTHCOMMERCIAL SITE-PLANNING GUIDERequest site requirements ↗ROOM, UTILITIES & COMMISSIONING
Plan commercial whole-body cryotherapy chamber access, power, ventilation, cooling-system interfaces, safety workflow, installation and commissioning. Final requirements must be confirmed against the exact model, destination and local project rules.
View installation checklist ↓SIX PLANNING WORKSTREAMS
Confirm the proposed model, external dimensions, service clearances and whether the system is electric, nitrogen-based or another documented architecture before preparing the room.
Check crate dimensions and weight, loading point, doorways, corridors, lift capacity, turning space, floor protection and the rigging or positioning plan.
Document voltage, phase, frequency, circuit, grounding, heat rejection, condensate or drainage needs and any external equipment required by the exact configuration.
For nitrogen-based proposals, obtain written nitrogen storage, delivery, exhaust, ventilation and oxygen-monitoring requirements. Requirements vary by system and jurisdiction.
Plan screening, changing, preparation, supervision, visibility, emergency access, entry and exit, post-session transition, cleaning and throughput between sessions.
Assign utilities checks, installation, functional and safety testing, operator training, daily inspections, preventive maintenance, acceptance records and local approvals.
CONFIGURATION-SPECIFIC INPUTS
A product brochure is not a site-requirements document. The final proposal should connect the exact equipment configuration to the room and operating model.
PROJECT SEQUENCE
Freeze the commercial configuration and included support systems.
Confirm layout, access, utilities, ventilation, workflow and responsibilities.
Complete local works and verify readiness before shipment or installation.
Position, connect, test, train, document and sign the acceptance record.
CONTINUE BUYER RESEARCH
INSTALLATION FAQ
There is no reliable category-wide room size. Use the exact model envelope, required service clearances, operator zone, client flow, supporting equipment and destination rules to prepare a dimensioned layout.
Only at concept level. Final electrical, ventilation, access, support-system and safety work should follow a written site-requirements document for the exact quoted model and configuration.
The buyer and local project team should confirm applicable building, electrical, mechanical, fire, occupational and facility rules. The supplier should document the equipment and installation assumptions needed for that review.
Approve the layout and access route, complete verified utilities and ventilation, assign installation responsibilities, confirm delivery handling, prepare the operating area and schedule commissioning and training.
Request the final specification, site requirements, installation and commissioning records, operating and maintenance instructions, training record, warranty scope, service contacts and an acceptance checklist.
CONTINUE BUYER RESEARCH
SITE-PLANNING REQUEST
Send the destination, facility type, room and access dimensions, available utilities, expected daily sessions and opening schedule.